Figure A.1 - Excavation of a pit for a structure intended for urgent burial of corpses
Figure A.2 - The operation of removing organic residues and mixing, together with a soil property modifier and a mineral binder, of the upper layer of soil of a structure intended for urgent burial of corpses
Figure A.3 - The operation of compacting the bottom layer of soil of the excavation of a structure intended for urgent burial of corpses, reinforced with a modifier of soil properties and mineral binder using a roller
Figure A.4 - The operation of moistening the topsoil of a structure intended for urgent burial of corpses, reinforced with a modifier of soil properties and mineral binder using a watering machine
Figure A.5 - Backfilling of a construction pit containing corpses and radioactive, hazardous chemicals and biological agents resulting from their decomposition
Figure A.6 - The operation of removing organic residues and mixing, together with a modifier of soil properties and a mineral binder, the top layer of soil of the embankment of a structure intended for urgent burial of corpses
Figure A.7 - Compaction of the embankment of a structure intended for urgent burial of corpses, reinforced with a soil property modifier and mineral binder using a roller
Figure A.8 - The operation of moistening the top layer of soil of the embankment of a structure intended for urgent burial of corpses, reinforced with a modifier of soil properties and mineral binder using a watering machine
Figure A.9 - Operation of installation in the embankment of a structure intended for urgent burial of corpses, devices for absorbing and neutralizing radioactive, hazardous chemicals and biological agents formed during the decomposition of corpses